Skip to content

Built-in oven Electrolux EVM9E2XT, Sensor, 44

SKU DGT0222363

Избери период за изплащане и виж месечната вноска

Месечна вноска Обща сума за плащане ГПР Лихва Банка

Description

Built-in Electrolux EVM9E2XT oven with touch control and a 44-litre capacity. The microwave oven has a power of 2100 W and 8 functions. Product dimensions are 45.0/56.0/55.0 cm (H/W/D).

Main Features

  • Colour: Matt Black
  • Type: Microwave Oven
  • Model: EVM9E2XT
  • Series: 700 Mealassist
  • Capacity: 44 l
  • Power: 2100 W
  • Control: Touch

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare